路沿石的安裝形式要注意什么?
路沿石多數(shù)用于道路邊的鋪設(shè),一方面可以保障行人,車(chē)輛交通的安全,另方面還可以使道路邊緣變得整潔美觀;及保障了安全又可以美化環(huán)境真的是建筑裝飾不錯(cuò)的一種選擇。日常生活中我們見(jiàn)到的都是鋪設(shè)好的路沿石,不知道路沿石的安裝形式是什么樣的,下面就說(shuō)一下路沿石的安裝形式:
Most roadside stones are used for paving along the road edges, which can ensure the safety of pedestrians and vehicles on the one hand, and also make the road edges clean and beautiful on the other hand; And ensuring safety while beautifying the environment is really a good choice for building decoration. In daily life, we often see paved curbstones. We don't know what the installation form of curbstones is. Let's talk about the installation form of curbstones:
路沿石的形式有立式、斜式和平式等。路沿石的鋪設(shè)起到保障行人、車(chē)輛交通安全和保證路面邊沿整齊的作用。從路面基層挖槽、安裝、路沿石背覆蓋加固了解了路沿石的施工工藝,并總結(jié)了路沿石的質(zhì)量要求及注意事項(xiàng),以保證施工質(zhì)量,提高道路美觀性。
The forms of curbstones include vertical, inclined, and flat. The laying of curbstones plays a role in ensuring the safety of pedestrians and vehicles and ensuring the neatness of road edges. We have gained an understanding of the construction process of road edge stones from the aspects of excavation, installation, and reinforcement of road base, and summarized the quality requirements and precautions for road edge stones to ensure construction quality and improve road aesthetics.
路沿石必須掛通線進(jìn)行施工,按側(cè)平面頂面示高標(biāo)線繃緊,按線碼砌側(cè)平臺(tái),側(cè)平臺(tái)要安正,切勿前仰后合,側(cè)面頂線順直圓滑平順,無(wú)高低錯(cuò)牙現(xiàn)象,平面無(wú)上下錯(cuò)臺(tái)、內(nèi)外錯(cuò)牙現(xiàn)象。
The curbstone must be constructed by hanging a straight line, and the elevation mark line on the top surface of the side plane should be tightened. The side platform should be built according to the line code, and the side platform should be upright and not folded forward or backward. The side top line should be straight, smooth, and smooth, without high or low misalignment, and there should be no upper or lower misalignment, internal or external misalignment on the plane.
1、在安裝路沿石時(shí)對(duì)于較大的路沿石的安裝需要一些工具,比如鉤子。路沿石安裝前我們首先把所用的砂漿等攪拌好,路沿石放到鋪設(shè)位置等。
1. When installing curbstones, some tools, such as hooks, are required for the installation of larger curbstones. Before installing the curbstone, we first mix the mortar used and place it in the laying position.
2、然后我們?cè)谑┕さ牟课贿M(jìn)行掛線,確定路沿石的高度和直度。如果沒(méi)有以前鋪設(shè)的可以先鋪設(shè)一塊然后作為標(biāo)準(zhǔn)來(lái)掛線。
2. Then we hang lines at the construction site to determine the height and straightness of the curbstones. If there is no previous laying, you can first lay a piece and use it as a standard to hang the line.
3、線掛好以后我們用工具把基槽清理至需要的部位。
3. After hanging the wire, we use tools to clean the base groove to the required position.
4、然后在路沿石的下方放入砂漿或者混凝土,根據(jù)圖紙?jiān)O(shè)計(jì)來(lái)放入。
4. Then, place mortar or concrete below the curbstone and place it according to the design drawings.
5、然后兩個(gè)人用鉤子鉤住路沿石的邊慢慢把路沿石放入砂漿上部。路沿石接頭部位的鉤子需要鉤住路沿石的兩側(cè),另外一頭鉤住端點(diǎn),可以把路沿石向前后移動(dòng)。
5. Then two people hooked the edge of the curbstone with hooks and slowly placed it on top of the mortar. The hook at the joint of the curb needs to hook onto both sides of the curb, and the other end hooks onto the endpoint to move the curb back and forth.
6、根據(jù)所掛的線,把路沿石放好以后我們輕拍把路沿石與上一塊路沿石的高度一致,安裝完成。
6. According to the hanging line, after placing the curbstone, we lightly tap the height of the curbstone to match the previous one, and the installation is completed.
路沿石的安裝形式大概就是這些內(nèi)容,了解后是不是就不會(huì)再認(rèn)為路沿石鋪設(shè)簡(jiǎn)單了,這些都是有一定的標(biāo)準(zhǔn)的必須要按照標(biāo)準(zhǔn)去執(zhí)行,不然安裝后的路沿石是不合格沒(méi)有辦法完成驗(yàn)收。
The installation form of road edge stones is roughly these contents. After understanding, it is no longer necessary to think that the laying of road edge stones is simple. These are all standards that must be followed, otherwise the installed road edge stones will be unqualified and cannot be accepted.