透水磚的鋪設(shè)有兩種方法,一種是濕鋪,一種是干鋪,關(guān)于干鋪的一些工藝來了解一下:
There are two methods for laying permeable bricks, one is wet laying and the other is dry laying. Let's learn about some techniques of dry laying:
干鋪是相對濕鋪而言的,它是指水泥和沙的體積要按1:3—1:2的比例,調(diào)和成干硬性的水泥砂漿,用它來做結(jié)合層鋪設(shè)透水磚和石材。
Dry paving is relative to wet paving, which refers to the mixing of cement and sand in a ratio of 1:3-1:2 to form a dry and hard cement mortar. It is used as a bonding layer to lay permeable bricks and stones.
施工工藝流程:首先交工驗收用1:3的水泥砂漿打底,打底厚度5-7mm,接著底子灰達到六七成干時候,按圖紙要求,進行彈線,排磚。當?shù)孛嬗蟹核臅r候,注意安排好泛水。
Construction process: First, use 1:3 cement mortar as the base for handover and acceptance, with a thickness of 5-7mm. Then, when the base ash reaches 60-70% dry, according to the drawing requirements, draw lines and lay bricks. When there is flooding on the ground, pay attention to arranging the flooding properly.
簡單來說,這就是基層處理,大致步驟:抹底子灰,彈線排磚,侵磚,鑲貼,擦縫。
Simply put, this is the basic treatment, which involves the following steps: plastering the base mortar, drawing lines to arrange the bricks, penetrating the bricks, tiling, and wiping the joints.
干鋪透水磚的時候,要注意水泥和沙子的比例調(diào)好砂漿,按照圖紙來進行鋪貼,在鋪貼之前,先做好基層的處理,貼的時候注意要按照順序來,貼完之后,注意擦縫。
When laying permeable bricks, attention should be paid to the ratio of cement and sand, and the mortar should be adjusted according to the drawings. Before laying, the base layer should be treated well, and the laying should be done in order. After laying, attention should be paid to wiping the joints.
透水磚鋪地安裝
Permeable brick paving installation
透水磚優(yōu)異的透水性及保水性來源于它20%左右的氣孔率。透水磚的強度可以滿足載重為10t以上的汽車。在國外,城市人行道、步行街、公寓停車場等地施工時可以像花崗石一樣進行鋪筑。
The excellent permeability and water retention of permeable bricks come from their porosity of about 20%. The strength of permeable bricks can meet the requirements of vehicles with a load capacity of more than 10 tons. In foreign countries, urban sidewalks, pedestrian streets, apartment parking lots, and other places can be paved like granite during construction.
透水磚的鋪筑方法同花崗石塊的鋪筑方法,由于其底下是干拌黃沙,因此比花崗石鋪筑更方便些。
The paving method of permeable bricks is the same as that of granite blocks. Due to the dry mixed yellow sand underneath, it is more convenient than granite paving.
透水磚的基層做法是:素土夯實→碎石墊層→礫石砂墊層→反滲土工布→1:3干拌黃沙→透水磚面層。
The base layer method of permeable bricks is as follows: rammed soil → crushed stone cushion layer → gravel sand cushion layer → reverse osmosis geotextile → 1:3 dry mixed yellow sand → permeable brick surface layer.
從透水磚的基層做法中可以看出基層中增加了一道反滲土工布,使透水磚的透水、保水性能能夠充分地發(fā)揮出來。
From the construction of permeable brick base, it can be seen that a reverse osmosis geotextile has been added to the base, allowing the permeable brick's permeability and water retention performance to be fully utilized.
更多的關(guān)于濟南透水磚的問題或者詳細的內(nèi)容,請進入我們公司的網(wǎng)站:http://slmachine.cn 網(wǎng)站中會有很多的內(nèi)容僅供參考。
For more questions or detailed information about Jinan permeable bricks, please visit our company's website: http://slmachine.cn There will be a lot of content on the website for reference only.